PART 1 - GENERAL
1.1 SCOPE: The work covered in this section
includes the furnishing of all labor, materials, equipment and
incidentals to install complete and ready for operation a sludge
thickening device as shown on drawings and as specified herein.
1.2 APPLICABLE PUBLICATIONS: The publications
listed below form a part of this specification to the extent
referenced. The publications are referred to in the text by the basic
designation only.
American National Standards Institute (ANSI) Publication:
B16.5-81 Pipe Flanges and Flanged Fittings American Society for Testing and Materials (ASTM) Publications:
A36 Structural Steel A53 Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded Seamless A283 Low and Intermediate Steel Plates of Structural Quality American Welding Society (AWS) Publication:
D1.1-84 Structural Welding Code, Steel A5.1 Mild Steel Arc-Welding Electrodes Standard Welding Terms and Definitions Standard Welding Symbols Steel Structures Painting Council (SSPC) Publication: SSPC-SPC-10 Near White Blast Cleaning 1.3 SUBMITTALS:
1.3.1 Contracting officer will review and approve all submittals. 1.3.2 Submit the following before fabrication 1.3.2.1 Shop drawing: Shop drawings for clarification and accessory equipment including principle dimensions and location of fittings. Data shall include weight and distribution of weight with the unit empty and filled with water. 1.3.2.2 Certified Test Results: Submit test results, signed by the manufacturer, which; a. Indicate sludge thickener tank is capable of specified requirements. Test on this model shall have been done within the last 3 years. 1.3.3 Submit the following after fabrication: 1.3.3.1 Verification:
1.4 MANUFACTURER’S SERVICE REPRESENTATIVE’S REPORT
AND CERTIFICATE: Submit service representative’s complete signed report
of results of the inspection, operation, adjustment, and tests. Report
shall include detailed descriptions of points inspected, tests and
adjustments made, quantitative results obtained if such are specified,
and suggestions for precautions to be taken to ensure proper
maintenance. Include the manufacturer’s certificate that equipment
conforms to specified requirements and is ready for permanent operation
and that nothing in installation will render manufacturer’s warranty
null and void.
1.5 DELIVERY, STORAGE, AND HANDLING MATERIALS:
1.5.1 Delivery and Storage: Inspect materials delivered to site for damage; unload and store with minimum handling. Store materials on site in enclosures or under protective coverings. Protect materials not suitable for outdoor storage to prevent damage during periods of inclement weather, including subfreezing temperatures, precipitation, and high winds. Store materials susceptible to deterioration by direct sunlight under cover and avoid damage due to high temperatures. Do not store materials on ground. Store and protect materials according to manufacturer recommendations. 1.5.2 Handling: Handle sludge thickener in such a
manner as to ensure delivery to final location in sound, undamaged
condition. Take special care not to damage interior and exterior
surfaces of the sludge thickener and associated equipment. Make
satisfactory repairs to damaged material(s) at no cost. Carry and do
not drag materials. Handle sludge thickener according to manufacturers
information.
1.6 QUALITY ASSURANCE:
1.6.1 Inspection: Examine each component of sludge thickener for compliance with requirements specified. Redesign or modification of equipment to comply with specified requirements, or necessary redesign or modification following failure to meet specified requirements, shall receive particular attention for adequacy and suitability. This element of inspection shall encompass visual examinations and dimensional measurements. Noncompliance with specified requirements, or presence of one or more defects preventing or lessening maximum efficiency of clarifier operation, shall constitute cause for rejection. 1.7 WELDER QUALIFICATIONS:
1.7.1 Welders shall be previously qualified by passing the tests prescribed in the AWS Standard Qualification Procedure, or by passing such other tests as the Engineer may accept. 1.7.2 Welders shall have been tested within the
past twenty four months and their qualifications shall be considered as
remaining in effect unless the welder is not engaged in a given process
of welding for a period exceeding six months.
PART 2 - SLUDGE THICKENER AND DESIGN CRITERIA AND DESCRIPTION
2.1 SLUDGE THICKENER CRITERIA
2.1.1 Applications: The sludge thickener shall be used to store and gravity thicken sludges from the waste treatment processes. Settled sludges shall be mechanically raked to the center of the tank and discharged on an as needed basis to the sludge compaction system via air diaphragm sludge pumps. Excess supernatant will gravity flow from the tank with provisions for manual decanting of waters via valves located on the side of the tank. 2.1.2 Performance: The sludge thickener tank shall have a minimum volume of
* gallons plus 6 inches of freeboard and be designed with a flat bottom center outlet to thicken the sludge to 3-5 percent.
2.2 SLUDGE THICKENER - MANUFACTURING SPECIFICATIONS
*2.2.1 Tank shall be of welded carbon steel construction, minimum thickness ¼ inch. The tank shall be approximately * feet in diameter with * feet sidewalls and have a capacity of * . 2.2.2 Tanks shall be supplied with a flat bottom
with flanged outlet connection as indicated. A center recessed well
shall collect the concentrated solids. A 2" minimum pipe with flanged
outlet shall extend from the center well. The pipe shall have at least
one welded support bracket. A 20" manway shall be installed in all
tanks taller than 8’.
*2.2.3 Thickener shall have a top mounted fully
suspended rake, to move the settled sludge to a center discharge port
located in the tank bottom. The rake mechanism shall produce * inch pounds of torque and be driven by a 440 VAC, 3 phase TEFC motor of a maximum
*
HP. The rake drive shall be a cantilevered design with the motorized
drive supported above the liquid surface eliminating all submerged
rotating seals and bearings. The gear reducer drive assembly shall be
of the high efficiency cyclical type. Worm gear reducers are not
acceptable. The rake tip speed shall not exceed 13 feet per minute.
2.2.4 Tank shall be provided with four (4) @ 2
inch diameter flanged decant withdrawal outlets located at
approximately two (2) foot intervals down the straight wall of the
thickener. A flanged overflow outlet shall be located approximately one
(1) foot from the tank top.
2.2.5 The following materials shall be used in the construction of the sludge thickener:
2.2.5.1 Structural Steel: Shall conform to ASTM A36 or ASTM A283, Grade C.
2.2.5.2 Fittings: Two inches IPS or less shall be flanged or threaded; larger sizes shall be flanged. Flanged fittings shall conform to ANSI B16.5. 2.2.5.3 Piping: Piping shall be standard weight carbon steel pipe conforming to ASTM A53 Grade A. *COMPLETE BLANKS FROM ATTACHED CHART
2.2.6 Provide ladder access to top of thickeners
for observation purposes. Ladder shall be of design and materials to
provide service intended and meet OSHA standards. A work platform shall
be installed to service the rake drive.
2.2.7 At least two (2) zinc anodes mounted to 3/4" pipe plugs shall be installed to galvanically protect the steel.
2.3 SURFACE PREPARATION AND COATING
2.3.1 Surface Preparation: The steel surfaces must be dry and clean in accordance with the following requirements. Remove all grease, oils and contaminants as outlined in SSPC SP1. Remove all weld splatter and grind burrs on cut edges and rough welds smooth. Blast clean all surfaces after fabrication in accordance with SSPC SP10 with profile depth of 1.5-2.0 mils. Apply first primer before any rust bloom forms. 2.3.2 Caulking: All exterior non-seal welding
joints shall be filled with rubber caulking before painting. Allow
sufficient time for caulking to dry before applying the finish coat.
2.3.3 Exterior Surfaces:
Shop First Coat: Apply one coat average dry film thickness of two mils minimum, of a high-build catalyzed epoxy. Apply to all steel surfaces except the areas within 2 inches adjacent to field welds and surfaces specified to be hot-dip galvanized. The paint shall be Hempel 4563U. Shop Finish Coat: Apply one coat average dry film
thickness of 1.0 mils minimum, of a polyurethane paint. Recoat at time
interval recommended by the manufacturer, the final coat shall be
Hempel 5595U.
Third Coat: Field touch-up of damaged and
unpainted areas shall be the same as specified first and second coats
at the same film thickness.
The total dry film thickness shall be an average of 4 mils.
2.3.4 Interior Surfaces:
Shop First Coat: Apply one coat average, dry film thickness of four mils, of an immersion grade high-build catalyzed epoxy. Apply to all steel surfaces except the areas within 2 inches adjacent to field welds and surfaces specified to be hot-dip galvanized. The paint shall be Hempel 15409. Shop Finish Coat: Apply one coat average, dry film
thickness of 4 mils, of an immersion grade high-build catalyzed epoxy.
Recoat at time interval recommended by the manufacturer, the final coat
shall be Hempel 15409.
Third Coat: Field touch-up of damaged and
unpainted areas shall be the same as specified first and second coats
at the same film thickness. (Liquid Contact).
The dry film thickness shall be an average of 6 mils.
PART 3 - DELIVERY, STORAGE AND HANDLING MATERIALS
3.1 Delivery and Storage: Inspect materials
delivered to site for damage; unload and store with minimum handling.
Store materials on-site in enclosures or under protective coverings.
Protect materials not suitable for outdoor storage to prevent damage
during periods of inclement weather, including subfreezing
temperatures, precipitation and high winds. Store material susceptible
to deterioration by direct sunlight under cover and avoid damage due to
high temperatures. Do not store materials directly on ground. If
special precautions are required, prominently and legibly stencil
instruction for such precautions on outside of equipment or its
crating. Store and protect materials according to manufacturers
recommendations.
3.2 Handling: Handle sludge thickener tank in such
a manner as to ensure delivery to final location in sound, undamaged
condition. Take special care not to damage interior and exterior
surfaces of sludge thickener tank and associated supports and pipe
coatings or linings. Make satisfactory repairs to damaged material(s)
at no cost. Carry and do not drag materials. Handle sludge thickener
tank according to manufacturers information.
PART 4 - EXECUTION:
4.1 Installation: Sludge thickening tanks to be
installed as indicated and as recommended by the manufacturer.
Equipment delivered to the site in advance of installation to be stored
per the manufacturer’s requirements. Make all connections as required
to make sludge thickener fully operation. Do not weld tank surfaces,
interior or exterior, it will permanently damage the interior lining.
If welding has inadvertently occurred, the interior surface affected
shall be abrasively ground to white metal and two coats of Hempel 15409
applied, with air dry between coatings.
4.2 Field Inspection Services: Examine each
component of sludge thickener tank for compliance with requirements
specified. Redesign or modification of equipment to comply with
specified requirements, or necessary redesign or modification following
failure to meet specified requirements, shall receive particular
attention for adequacy and suitability. This element of inspection
shall encompass visual examinations and dimensional measurements.
Noncompliance with specified requirements, or
presence of one or more defects preventing or lessening maximum
efficiency of sludge thickener tank operation, shall constitute cause
for rejection.
4.3 Start-up Testing: Manufacturer’s field
representative shall inspect and test unit and certify that the
installation has been performed in accordance with manufacturer’s
recommendations and that the system is ready for operation by others.
Inspection shall consider, but not be limited to, the following:
4.4 Warranty: The manufacturer shall provide a written warranty
for the equipment, workmanship and materials for a period of twelve
months from date of installation or fifteen months from date of
shipment whichever occurs first. This warranty provision shall be the
only warranty applicable to this specification.
PART 5 - SUGGESTED MANUFACTURER:
5.1 The sludge thickener described shall be model no.
* .
Supplied by:
Hoffland Environmental, Inc. 10391 Silver Spring Road Conroe, Texas 77303 (936) 856-4515 phone (936) 856-4589 fax e-mail: [email protected] *COMPLETE BLANKS FROM ATTACHED CHART HOFFLAND ENVIRONMENTAL, INC.
SLUDGE THICKENER MODELS
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||